A guide to detours for the Route 128 bridge demolition in Needham

This browser does not support the video element.

BOSTON — From Nov. 4 to Nov. 6, the Massachusetts Department of Transportation will be demolishing the existing Highland Avenue Bridge over Interstate 95.

In order to keep drivers safe from the operation, MassDOT will close a portion of the expressway during the demolition.

"If you have to travel during the peak times on Saturday and Sunday, please allow extra time as we are expecting delays to occur," said Walter Heller with MassDOT.

Friday 8 p.m. – Saturday 3 p.m.

  • Route 128/I-95 North closed
  • East side of old bridge demolished

Saturday 3 p.m. – 6 p.m.

  • Route 128/I95 North and South closed
  • Demolition "transition period"

Saturday 6 p.m. – Sunday 3 p.m. 

  • Route 128/I95 South closed
  • West side of old bridge demolished

Detour Routes Associated with the North Bound Rt. 128 (I-95NB) Bridge Demolition:

Detour Routes Associated with the South Bound Rt. 128 (I-95SB) Bridge Demolition: